Episode Summary
Executive Summary: In this October highlights episode, David Roberts revisits practical lessons in passing climate and clean-energy policy. Leah Stokes reflects on the personal costs and urgency behind the Inflation Reduction Act, arguing that a livable planet is part of caring for children. Daniel Palkin explains why U.S. interregional transmission planning has failed and how proposed bipartisan permitting legislation could require meaningful planning and address incentives that block new lines.
Main Topics: October’s focus on getting clean-energy policy passed: Roberts frames the month’s conversations around practical strategies for passing legislation and local projects, including the Inflation Reduction Act, permitting reform, activism, and Denmark’s energy policy. The personal stakes of the Inflation Reduction Act: Stokes discusses writing about the IRA fight alongside the experiences of people building families during it, including her high-risk twin pregnancy and time in the hospital. A livable future as a reason to act: Stokes argues that preparing for children should mean more than childproofing a home: it should include helping secure a safe, livable planet. She also emphasizes the role of journalists and public conversation in making climate legislation possible. Why interregional transmission is not getting built: Palkin explains that transmission depends on centralized planning and that U.S. processes have struggled particularly to coordinate between utility territories and planning regions. Proposed permitting bill and transmission planning reforms: The bill discussed would require neighboring regions to plan together periodically, identify transmission needs and solutions, and select projects that meet affordability and reliability criteria. It also aims to counter planning delays by stakeholders with incentives to stall. Utility incentives and barriers to cross-territory lines: Palkin says utilities may resist interregional projects because they may be competitively bid rather than awarded to them, and because importing power can lower local prices or benefit generation outside their territory.
Key Arguments: Stokes presents the IRA as both a major climate-policy achievement and a deeply personal effort, arguing that pursuing a livable planet is part of caring for the next generation. Public attention and journalism are critical to building the conditions for climate legislation; without sustained discussion and media coverage, progress becomes harder. Transmission planning is the most fundamental of the permitting, planning, and paying challenges: without a process that identifies and advances needed lines, permitting reform alone cannot deliver them. Existing interregional coordination has produced no transmission lines, demonstrating that the prior process was ineffective and too weak to compel meaningful outcomes. The proposed bill would create a stronger, recurring regional planning process with affordability and reliability tests, while addressing the risk that financially motivated stakeholders can delay planning until it becomes merely procedural. Utilities may have little incentive to champion some cross-territory lines because they may lose exclusive construction opportunities and the resulting power flows can reduce local prices or benefit other generators.
Data Points: Twins’ time in the NICU: 75 days - Roberts notes that one of Stokes’s twins spent 75 days in the neonatal intensive care unit. Hospital monitoring point mentioned: 32 weeks - Stokes says her doctor described a possible hospital stay beginning at 32 weeks for continuous monitoring in a particular type of twin pregnancy. Interregional planning regions: 11 - Palkin says the regions were established after FERC’s 2011 Order 1000. Borders between regions: 15 - Palkin identifies 15 region-to-region borders across the 11 planning regions. Years since Order 1000: 15 years - Palkin uses the period since the 2011 rule to illustrate the duration of the interregional planning opportunity. Region-pair years of opportunity: 225 - Palkin’s back-of-the-envelope calculation multiplies 15 region borders by 15 years. Interregional transmission lines planned and built through the process: 0 - Palkin says the existing process has resulted in zero such lines.
Pivotal Quotes: "I think much more expansively, like, I don't know, giving my children a livable planet." — Leah Stokes: Stokes explains how the personal story in her book connects parenting and the effort to pass climate policy. "If we don't talk about climate change, if we don't have media attention and conversations, it makes it way harder." — Leah Stokes: Stokes emphasizes the importance of journalism and public discussion in creating opportunities for climate legislation. "We have had an opportunity to do what the order lays out as inter-regional coordination ... Do you want to guess how many inter-regional transmission lines have been planned and built as a result? It is actually identically zero." — Daniel Palkin: Palkin summarizes the failure of the existing interregional transmission-planning process.
Implications: Climate progress requires both public engagement and workable institutions. Stronger interregional planning could help unlock transmission needed for clean energy, but reform must overcome utility and stakeholder incentives that favor delay or limit competition.