Live: A new era for grid flexibility?

The last few months have brought more momentum for grid flexibility than the last decade. All across the country, load growth is pushing policymakers to leverage DERs and other flexibility tech to get more out of the grid we’ve already built. But can utilities count on it? This week, live from Latit

Featured Speakers

Latitude Media HostTodd Conner Guest

Topics Discussed

Episode Summary

Executive Summary: At Flex Summit in Austin, hosts and guests argue that rapid load growth—especially from data centers—makes grid flexibility an urgent practical tool, not merely a policy aspiration. Virginia, federal permitting proposals, and California are taking steps to enable distributed energy resources (DERs), but implementation details, utility incentives, and execution remain decisive. Xcel executive Todd Conner stresses that flexibility should be judged by customer value and avoided costs, not by DER deployment totals alone.

Main Topics: Virginia's flexibility-focused energy plan: Virginia's plan models pathways including 10 GW of distributed resources by 2045 and flexible data centers. Speakers discuss the trade-offs between cost, emissions, health impacts, and reliable capacity, while emphasizing that legislation, regulators, utilities, and rate-case decisions must turn the plan into action. Federal permitting legislation and wholesale-market access: A proposed permitting bill would require grid operators to open markets to DER aggregations within 18 months and limit utility barriers such as mandatory physical meters. Jen Downing welcomes the reforms but warns that implementation, data access, and capacity accreditation can still undermine VPP economics. California's shift from pilots toward utility planning: Recent California bills direct regulators to better value DERs and require utilities to report grid utilization. Speakers see this as a move beyond temporary taxpayer-funded demand-response programs, but note uncertainty over whether utilities will procure enough services to sustain VPP businesses. Utility operations: flexibility as a tool for customer value: Xcel's Todd Conner describes flexibility and grid utilization as ways to connect load faster, avoid or defer capital investment, and reduce customer costs. He argues that the right solution varies by location and should be assessed by the value delivered, not by DER adoption alone. VPPs, machine learning, and grid modernization: Energy Hub describes using algorithms and device data to coordinate batteries, thermostats, and electric vehicles around utility needs, customer rates, solar availability, and peak demand. More mature VPPs can provide real-time services and address distribution-system constraints. Load growth, affordability, and speed to power: The panel frames data-center and broader load growth as a major test for utilities and policymakers. Large customers should pay their own way and accept flexibility requirements, while better use of existing infrastructure may help avoid costly expansion and rate increases.

Key Arguments: Flexibility can help meet fast-growing demand without relying solely on new generation and grid construction. Speakers argue that getting more out of infrastructure already built can improve affordability and shorten connection timelines. Plans and legislation are only starting points: execution depends on coordinated action by legislatures, regulators, utilities, and market operators, as well as practical details such as interconnection, data feeds, and DER compensation. DERs should be treated as one tool among many. Todd Conner says utility decisions should prioritize customer value, avoided capital costs, and the cost of serving the next increment of load rather than a target for DER spending or peak reduction. Location matters: flexibility can be especially valuable at constrained substations or feeders, where targeted peak reductions may defer wires investment and create room for new load. Large loads should bear the costs they cause and be subject to flexibility conditions. The panel cites this as a way to protect existing customers while enabling economic development and faster service. VPP potential is substantial, but commercial viability requires reliable measurement and compensation. Downing cautions that market access rules alone are insufficient if utilities' data systems fail or aggregations receive inadequate accredited capacity.

Data Points: Energy Hub utility customers and flexible capacity: More than 230 utilities; 3.6 GW - Sponsor description of Energy Hub's platform and aggregated VPP capacity. Everyday Electric residential VPP capacity: More than 6 GW - Sponsor description of the residential VPP operated by Everyday Electric, formerly Renew Home. Virginia distributed-resource target: 10 GW by 2045 - The governor's energy plan includes a flexibility pathway with this level of distributed resources. Virginia modeled capacity and forecast additions: About 30 GW installed; 60–120 GW added in scenarios - Jen Downing describes the scale of load and capacity growth represented in the state's scenarios. Virginia flexibility-pathway distributed gas: Up to 5 GW - The modeled pathway allows this much distributed, non-combustion gas capacity, such as fuel cells. Proposed federal market-access deadline: 18 months - The permitting bill would require grid operators to open markets to DER aggregations on this timeline. Utility data-feed availability example: 65 out of 365 days - Downing says a utility distribution-data feed can fail for this many days in a year, impeding DER performance measurement. Potential VPP contribution to peak: 10% to 20% - Downing recounts DOE work suggesting that a reasonable share of available device capacity and enrollment could provide this level of peak flexibility. Xcel system peak: 19–20 GW - Conner gives the approximate peak for Xcel's system across its territory. Potentially harvestable headroom: 30% to 40% of identified headroom in a jurisdiction - Conner estimates the portion that might be achievable economically; he stresses this is location-dependent, not a systemwide target.

Pivotal Quotes: "Flexibility is a commodity to be harvested." — Todd Conner: His framing of flexibility as a practical operational resource for improving grid utilization and customer value. "It's not about buying DER, it's not about how do we put a VPP on. Those are just tools. It's customer value at the end that we have to get to." — Todd Conner: Conner explains why grid investments and flexibility programs should be evaluated by results for customers rather than deployment totals. "The devil is in the details, and we need people kind of fighting at every step of the way on exactly how it gets implemented." — Jen Downing: Her caution that broad market reforms will not deliver results without sustained attention to utility data, measurement, and compensation rules.

Implications: Utilities and policymakers face pressure to make flexibility operational at scale as demand rises. VPPs can defer investment and speed connections, but durable progress requires fair large-load tariffs, location-specific planning, reliable data, workable compensation, and regulatory follow-through—not just plans or pilot programs.