Catalyst with Shayle Kann
Catalyst with Shayle Kann

The battery boom behind the AI buildout [partner content]

The AI buildout is the most capital-intensive project in history. The hunger for power has pushed companies to unconventional options, sparking demand for jet engines, mobile trailer-mounted generators, and hybrid microgrids. And now batteries are having a moment. The urgency to connect to the grid

Featured Speakers

Kelsey Pegler Guest

Topics Discussed

Episode Summary

Executive Summary: FlexGen CEO Kelsey Pegler and COO Hugh Scott explain why batteries have rapidly become central to data-center development: they can support reliable power, smooth extreme demand fluctuations, reduce power costs, and help projects secure or avoid grid interconnections. The speakers discuss changing data-center designs, microgrids, energy-management software, battery procurement and aging, and the need for flexible systems as AI hardware and power requirements evolve.

Main Topics: Why data centers are adopting batteries: Batteries can provide uninterrupted power, improve power quality for volatile AI workloads, manage peak consumption, lower power costs, and potentially enable more data-center capacity or easier interconnection. Explosive demand and changing data-center designs: Hyperscalers are seeking power wherever it is available, while new facilities face severe power constraints. The speakers describe a transition toward liquid-cooled, high-density computing and major changes in facility architecture. Battery systems, software, and reliability: Large containerized battery systems differ from traditional rack-level UPS equipment. Energy-management systems coordinate batteries, inverters, and other power sources, optimize operation, and help preserve battery life; FlexGen says it tests configurations in a real-power lab. Microgrids and alternative power strategies: Some developers are exploring behind-the-meter generation and fully off-grid microgrids that combine batteries with sources such as gas, engines, or nuclear power, potentially bypassing lengthy grid-interconnection timelines. Procurement risks and long-term flexibility: Developers must match equipment to use cases, availability, cost, regulations, and project timelines. Unlike storable solar panels, batteries degrade while idle and need timely commissioning and charging; control systems must also accommodate changing plant designs. Market growth and outlook: Data centers are becoming a major source of commercial and industrial battery demand. The guests expect adoption to grow and argue that batteries and flexible controls will be increasingly important to the future grid.

Key Arguments: Data-center batteries are becoming a need-to-have rather than a nice-to-have because they address reliability, power quality, peak-demand, and interconnection challenges at once. AI computing creates unusually large and fluctuating loads; the guests cite a 50-fold increase in power density for a newer NVIDIA chip and describe the resulting need for large-scale backup and power management. The market is moving quickly: FlexGen had no data-center revenue historically, but expects more than half of its forward 12-month revenue dollars to come from the sector. Battery projects require more than hardware. Energy-management software must coordinate the battery and other plant assets, optimize operating instructions, and adapt as equipment and data-center designs change. Battery procurement timing is critical because batteries degrade during storage, unlike solar panels that can be stored and later used; buyers must align compliant, compatible equipment with construction and commissioning schedules. Off-grid and distributed microgrids are increasingly under consideration, although regulatory complexity and the unprecedented scale of some proposals remain important challenges. The speakers argue that confidence in controls should come from demonstrated performance rather than assumption, citing FlexGen's lab testing with real batteries, inverters, loads, and power flows.

Data Points: Data centers' share of battery capacity installed in the C&I sector: 75% - The host says data centers account for this share of installed commercial and industrial battery capacity. Expected growth in the data-center battery market: Five-fold over the next decade - The host describes the market's projected expansion. FlexGen's forward 12-month revenue expected from data centers: More than half - Pegler contrasts the forecast with the company's prior history of no data-center revenue. Power density of NVIDIA's newest chip compared with its predecessor: 50 times - Pegler uses the increase to explain why traditional, handheld UPS batteries are insufficient for modern racks. NVIDIA chips sold in one quarter: 400,000 - Pegler says each chip consumes power comparable to one U.S. home, collectively likening the load to Austin, Texas. Facility size in an example of an older data center: 200,000 square feet - Pegler says the facility was not fully occupied because it lacked enough power. Unoccupied share in an example of a newer data center: 90% - Pegler describes a new facility as only 10% occupied because available power was insufficient. Period marking the shift from first-of-its-kind battery projects: About 24 months - Pegler says projects before then were mostly novel, while early movers have since expanded their portfolios. Scale of some proposed data-center microgrids: One gigawatt and above - Scott identifies scale as a novel challenge for microgrid control and design. Data centers' share of batteries deployed in the U.S. in the first half of the year: About one-fifth - The host raises this figure while asking whether data centers will become the dominant source of battery capacity.

Pivotal Quotes: "All of them will take anything." — Kelsey Pegler: She recounts a hyperscaler's response when asked where it would get power, capturing the urgency of demand. "A battery is much different. It's more akin to buying like a live animal, like a cattle." — Kelsey Pegler: She explains that batteries degrade while idle, making procurement and commissioning timelines unusually important. "I think batteries are maybe in the top of the second inning, just getting started." — Kelsey Pegler: Her closing assessment emphasizes the early stage and expected continued growth of battery deployment.

Implications: Data-center developers will need to treat batteries, controls, and power sources as an integrated, flexible system—not a simple backup add-on. Demand could accelerate battery deployment and reshape grid planning, while raising the stakes for procurement timing, reliability testing, and adaptable designs.

🔓 Sign Up for Unlimited Episode Search

About Catalyst with Shayle Kann

View all episodes from Catalyst with Shayle Kann